{"id":11437,"date":"2026-09-13T08:46:56","date_gmt":"2026-09-13T00:46:56","guid":{"rendered":"https:\/\/tiiocti.com\/bag-order-spec-change-requests\/"},"modified":"2026-09-13T08:47:00","modified_gmt":"2026-09-13T00:47:00","slug":"demandes-de-modification-des-specifications-des-commandes-de-sacs","status":"publish","type":"post","link":"https:\/\/tiiocti.com\/fr\/bag-order-spec-change-requests\/","title":{"rendered":"Communication relative aux commandes de sacs : cahiers des charges \u00e9crits, demandes de modification et traces \u00e9crites permettant de garantir le bon d\u00e9roulement des commandes"},"content":{"rendered":"<p>The short answer: more bag orders are lost to unclear communication than to price, and the fix is a written spec that both sides sign, plus a change process that leaves a paper trail. A verbal change made on a call, a logo adjusted without a revision number, or a sample that nobody kept can turn a straightforward order into a dispute about what was actually agreed. Put the spec in writing, control the revisions, and keep the approved sample, and most of those disputes never happen.<\/p>\n<h2>Why a written spec beats a chat thread<\/h2>\n<p>Bag orders have many variables, and each one is a chance for the two sides to believe different things. Fabric weight, cord type, print position, thread colour, packing method and label wording all have to be pinned down before production, and a chat thread does not pin anything down. A written spec does, because it gives every variable a value that both sides can read back. When a question comes up later, the spec is the answer, and the supplier and the buyer are looking at the same page instead of remembering the same call differently.<\/p>\n<h2>What a bag spec sheet has to contain<\/h2>\n<p>A spec that leaves a field blank is a field that will be filled by assumption. The table lists the fields that save the most orders, and the reason each one matters.<\/p>\n<table>\n<thead>\n<tr>\n<th>Spec field<\/th>\n<th>What to write<\/th>\n<th>Why it prevents a dispute<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dimensions<\/td>\n<td>Finished W x H x D in mm, with tolerance<\/td>\n<td>A bag that is out by 10 mm is a different bag<\/td>\n<\/tr>\n<tr>\n<td>Fabric and weight<\/td>\n<td>Material plus GSM, with the test method<\/td>\n<td>&#8220;Heavy cotton&#8221; means different things to different mills<\/td>\n<\/tr>\n<tr>\n<td>Cord or handle<\/td>\n<td>Type, diameter, colour, length<\/td>\n<td>The cord is the part the buyer feels first<\/td>\n<\/tr>\n<tr>\n<td>Print and position<\/td>\n<td>Artwork file, size, placement in mm<\/td>\n<td>Placement argued after production cannot be fixed<\/td>\n<\/tr>\n<tr>\n<td>Thread colour<\/td>\n<td>Colour reference for body and logo stitching<\/td>\n<td>An unmatched thread is a visible reject<\/td>\n<\/tr>\n<tr>\n<td>Packing<\/td>\n<td>Carton count, carton dimensions, marks<\/td>\n<td>Packing agreed late changes the freight<\/td>\n<\/tr>\n<tr>\n<td>Revision<\/td>\n<td>A revision number and date on every page<\/td>\n<td>The current spec is always identifiable<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How to raise a change request<\/h2>\n<p>A change request is not a problem, as long as it arrives before the point where changing it costs more than the change is worth. Every change should be written, numbered and acknowledged, so the factory is working from a document rather than an instruction. Say what changes, why, and by when, and ask for the effect on price and lead time in the same message. A change that moves the print position is cheap before the screen is made and expensive after. A change that moves the fabric weight can change the whole bag, so it should trigger a new sample rather than a note. The discipline is simple: no change without a revised spec, and no revised spec without both sides confirming it.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-9189\" src=\"https:\/\/tiiocti.com\/wp-content\/uploads\/2026\/04\/preproduction-sample-bags-material-verification-and-reach-co-highlight-scaled.jpg\" width=\"1024\" height=\"576\" loading=\"lazy\" alt=\"bag order spec verification on pre-production samples\" srcset=\"https:\/\/tiiocti.com\/wp-content\/uploads\/2026\/04\/preproduction-sample-bags-material-verification-and-reach-co-highlight-1280x854.jpg 1280w, https:\/\/tiiocti.com\/wp-content\/uploads\/2026\/04\/preproduction-sample-bags-material-verification-and-reach-co-highlight-980x653.jpg 980w, https:\/\/tiiocti.com\/wp-content\/uploads\/2026\/04\/preproduction-sample-bags-material-verification-and-reach-co-highlight-480x320.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, 100vw\" \/><\/p>\n<h2>The paper trail that saves an order<\/h2>\n<p>The strongest protection is a signed sample. Before bulk production, both sides sign and keep the same physical sample, sometimes called the golden sample, and every later question is answered against it. The approval should record the date, the spec revision it represents, and any note about what is still open. Test reports belong in the same file, so a claim about restricted substances, colour fastness or seam strength can be checked against the report rather than the memory of a meeting. Where a buyer works to a recognised material standard, such as the restricted-substance limits published by <a href=\"https:\/\/www.oeko-tex.com\/\" target=\"_blank\" rel=\"noopener\">OEKO-TEX<\/a>, the report reference should sit in the spec so it travels with the order.<\/p>\n<h2>Where these orders usually go wrong<\/h2>\n<p>The same four mistakes appear again and again. A verbal change is made on a call and never written down, so the factory builds to the old spec. A sample is approved but not kept, so nobody can prove what was agreed. A spec is updated in one place but not in another, so two versions circulate. And an assumption is made on a field that was left blank, usually the cord or the packing. Each one is prevented by the same habit: write it, number it, sign it, keep it.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-7336\" src=\"https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples.jpg\" width=\"768\" height=\"768\" loading=\"lazy\" alt=\"incoming inspection of bag order samples\" srcset=\"https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples.jpg 1024w, https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples-300x300.jpg 300w, https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples-150x150.jpg 150w, https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples-768x768.jpg 768w, https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples-600x600.jpg 600w, https:\/\/tiiocti.com\/wp-content\/uploads\/2025\/08\/Gloved-hands-using-magnifier-to-inspect-red-non-woven-bag-samples-100x100.jpg 100w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<h2>FAQs about bag order spec change requests<\/h2>\n<h3>Why put a bag spec in writing instead of agreeing by message?<\/h3>\n<p>A written spec gives every variable a value both sides can read back, so a later question is answered by the document rather than by memory. Chat threads do not pin down fabric, cord, print or packing.<\/p>\n<h3>What should a bag spec sheet include?<\/h3>\n<p>Finished dimensions with tolerance, fabric and GSM with the test method, cord or handle details, print artwork and position, thread colour, packing and carton details, and a revision number on every page.<\/p>\n<h3>When is it too late to change a bag order?<\/h3>\n<p>A change is cheap before tooling and expensive after. Moving a print position is low cost before the screen is made, while changing the fabric weight can require a new sample and moves both price and lead time.<\/p>\n<h3>What is a golden sample?<\/h3>\n<p>It is the approved physical sample that both sides sign and keep. Later questions are answered against it, and it proves what was agreed far better than a photo or a message.<\/p>\n<h3>How do I keep control of spec revisions?<\/h3>\n<p>Number and date every revision, replace the previous version rather than editing in place, and confirm receipt in writing. A superseded spec should never be left in circulation.<\/p>\n<h2>Communicate the order like a document<\/h2>\n<p>Write the spec, number the revisions, sign and keep the sample, and raise every change in writing with its cost and lead-time effect. That discipline protects the buyer and the factory, and it is far cheaper than arguing about a bag that was built to the wrong version. If you want bag orders run from a written spec with controlled changes and a signed sample, talk to <a href=\"https:\/\/tiiocti.com\/\">our bag manufacturing team<\/a>.<\/p>\n<p>Related reading: our <a href=\"https:\/\/tiiocti.com\/post-consumer-fiber-heavy-duty-bags\/\">post-consumer fiber blend guide<\/a> and our <a href=\"https:\/\/tiiocti.com\/drawstring-bags\/\">drawstring bags range<\/a>.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Why put a bag spec in writing instead of agreeing by message?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A written spec gives every variable a value both sides can read back, so a later question is answered by the document rather than by memory. Chat threads do not pin down fabric, cord, print or packing.\"}}, {\"@type\": \"Question\", \"name\": \"What should a bag spec sheet include?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Finished dimensions with tolerance, fabric and GSM with the test method, cord or handle details, print artwork and position, thread colour, packing and carton details, and a revision number on every page.\"}}, {\"@type\": \"Question\", \"name\": \"When is it too late to change a bag order?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A change is cheap before tooling and expensive after. Moving a print position is low cost before the screen is made, while changing the fabric weight can require a new sample and moves both price and lead time.\"}}, {\"@type\": \"Question\", \"name\": \"What is a golden sample?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It is the approved physical sample that both sides sign and keep. Later questions are answered against it, and it proves what was agreed far better than a photo or a message.\"}}, {\"@type\": \"Question\", \"name\": \"How do I keep control of spec revisions?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Number and date every revision, replace the previous version rather than editing in place, and confirm receipt in writing. A superseded spec should never be left in circulation.\"}}]}<\/script><br \/>\n<script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"Article\", \"mainEntityOfPage\": \"https:\/\/tiiocti.com\/bag-order-spec-change-requests\/\", \"headline\": \"Bag Order Communication: Written Specs, Change Requests, and Paper Trails That Save Orders\", \"about\": \"bag order spec change requests\", \"description\": \"How written bag specs, controlled change requests and a signed golden sample prevent order disputes, and what a bag spec sheet must contain.\", \"author\": {\"@type\": \"Organization\", \"name\": \"Tiiocti\"}}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The short answer: more bag orders are lost to unclear communication than to price, and the fix is a written spec that both sides sign, plus a change process that leaves a paper trail. A verbal change made on a call, a logo adjusted without a revision number, or a sample that nobody kept can [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9189,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Bag Order Communication: Written Specs, Change Requests, and Paper Trails That Save Orders","rank_math_description":"Bag Order Communication: Written Specs, Change Requests, and Paper Trails That Save Orders","rank_math_focus_keyword":"bag order spec change requests","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":""},"categories":[68],"tags":[],"class_list":["post-11437","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sourcing-guide"],"_links":{"self":[{"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/posts\/11437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/comments?post=11437"}],"version-history":[{"count":1,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/posts\/11437\/revisions"}],"predecessor-version":[{"id":11438,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/posts\/11437\/revisions\/11438"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/media\/9189"}],"wp:attachment":[{"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/media?parent=11437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/categories?post=11437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tiiocti.com\/fr\/wp-json\/wp\/v2\/tags?post=11437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}